Case Study Glencorse Reservoir, Penicuik Client: Scottish Water Contractor: McKenzie Construction Summary of Albion Works: Installed 61 No. TITAN 30/16 Galvanised Ground…Albion Drilling
Case Study Luxury Housing Development, Clifton, Bristol Client: Cabot Homes Scale: £1m Duration: 35 weeks Summary of Albion Works: Design and build Construction of soil…Albion Drilling
Case Study Slope Stabilisation Works, Aberdeen Client: Sanctuary Housing Main Contractor: Safedem Ltd Contract Duration: 9 Months Contract Value: £1.4m Summary of Albion Works: Installation…Albion Drilling
Case Study The Little Boltons, Kensington, London Client: Westgreen Construction Duration: 4 weeks Summary of Albion Works: Ischebeck Titan tension micropiles in terrace gravels…Albion Drilling
Case Study New Tesco Store – Ilfracombe, Devon Client: Costain Scale: £250,000 Duration: 8 weeks Summary of Albion Works: Design-build rock bolting scheme to…Albion Drilling
Case Study Handsacre & Armitage, Staffordshire – Four Track West Coast Mainline Type of work: Soil Nailing and facings Client: Galliford Try Value: £1.1m Summary of Albion Works: Installation of…Albion Drilling
Case Study Sellwood Terrace, London Summary of Albion Works: Ischebeck Titan contiguous micropiles and underpin piles in London Clay Basement…Albion Drilling
Case Study Royal Victoria Hospital, Belfast, Northern Ireland Client: FK Lowry Piling Ltd Value: £250,000 Duration: 5 months Summary of Albion Works: Dywidag PST monobar…Albion Drilling
Case Study Rothesay, Isle of Bute, Scotland Type of Work: Ground Anchoring and Rock Sockets Client: Balfour Beatty Civil Engineering Limited Scale: £640,000 Duration: 18 weeks…Albion Drilling
Case Study Boston Haven, Lincolnshire Client: Interserve, Environment Agency Value: £320,000 Summary of Albion Works: 172 nr permanent hollow bar anchors…Albion Drilling