Client: Transport Scotland
Main Contractor: Ferrovial Lagan Joint Venture
Contract Duration: 20 months
Contract Value: £6.2m
Summary of Albion Works:
- Installation of over 5000 No. Dywidag R32-210 & R38-420 Soil Nails (2.0m to 16.0m long)
- Installation of 15,000m² of Maccaferri MacMat R Netting
- Installation of 480 No. Inclined Permanent Ground Anchors (16.0m to 33.0m long)
- Installation of 160 No. Inclined Temporary Ground Anchors (Including Waling System)
- Installation of 310 No. Anti-Flotation Micro Piles
- Provision of Design Consultancy Services
Technical Difficulties:
Working within lane closures in close proximity to the existing M74 and M8 Motorways