
Client: Costain
Scale: £250,000
Duration: 8 weeks
Summary of Albion Works:
- Design-build rock bolting scheme to allow the stabilised excavation of difficult slate ground to enable the construction of new superstore
- 14 tonne rock bolting rig used to rock drill 700nr 5.0m rock bolts and rock meshing in 2 site locations
- Installation of soil nails by 3 rigs and abseil teams
- Project completed within budget and on schedule