Client: Sanctuary Housing
Main Contractor: Safedem Ltd
Contract Duration: 9 Months
Contract Value: £1.4m
Summary of Albion Works:
- Installation of 100m long, 5.0m high Gabion Wall Platform
- Installation of 741No 12.0m long, Dywidag R32-280 Soil Nails
- Installation of 100No. Anchor Drains by Anchor Systems UK Ltd
- Installation of 8,000m² of Maccaferri Rock Fall Netting (2 Layers @ 4000m²)
- Placing of 300mm Layer of Class 6G Stone over an area of 4000m²
- Installation of 4,000m² of 300mm deep Greenfix Geoweb® soil retention system
- Placing of 2,415t of topsoil
Technical Difficulties:
- Asbestos contaminated former paper mill
- Contaminated Land
- Working in close proximity to the River Don